
Shale thermal simulation equipments
Studies of shale gas production and reserves data provide a feasible basis for development and production of shale gas by heating a shale rock and simulating shale to generate high pressure gas under 600℃ high temperature, which is then cooled down to 150℃.
Main functions:
Automatic control or manual control to complete test pieces of the test, manual and automatic modes can be used separately. . At the same time, both can automatically collect, display, record and analyze pressure test data.
A throttle valve can adjust the gas flow into gas reservoir.
System can automatically detect t pressure from high-pressure gas.
System can automatically detect pressure of each gas cylinder.
Computer automatically generates pressure and time curves, provides real-time display and stores a variety of data. It can print out t Chinese and English inspection reports at any time. At the same time, data recording instrument is installed for real-time recording of test pressure.
Software has user's friendly interface, users can set testing project, pressure, time, and other settings. With a customized printing format, data can be transferred to Word Microsoft, and users can modify their own printing format, which is convenient and practical.
In a test report, pressure and video information corresponding to time axis of a testing process can be randomly found in order to analyze the leakage of test products.
Equipment supports f overpressure alarm shutdown function.
Equipment supports emergency pressure relief and shutdown function.